The mechanism of budget prioritization for roads maintenance and rehabilitation at uncertainty condition (case study of khorram abad-doroud road)

Document Type : Original Article

Authors

1 Assistant Professor, Faculty of Engineering, Arak University, Arak, Iran.

2 M.Sc., Candidate, Islamic Azad University, South of Tehran Branch, Tehran, Iran.

10.22034/tri.2021.113132

Abstract

pavement management system (PMS) is the coordinate and regular process for doing all of the activities in roads. the main purpose of PMS is the prediction of pavement condition and the life cycle cost for determining the suitable time table. by true construction and management, we can provide a true decision making and sustainable maintenance for rehabilitation and reconstruction of the roads. The true construction and management. PMS is the economic method for maintenance of the one of the most important national funds. the aim of this research is that according to the uncertainty of the assigned budgets, the optimum management for M&R methods was done. at this research, the road of Khorramabad-dorood was selected as the case study. the objective function at this research is the promotion of the roads quality according to budget limitations. for calculations, GAMS software has been used. the results show that, how we can prioritize the budget among the several sections.

Keywords

Main Subjects


- سیف، ب.، و عباسیان جهرمی­، ح.ر.، (1394)، "مدیریت روسازی راه­های روستایی استان خوزستان با استفاده از منطق فازی"، هفتمین همایش قیر و آسفالت ایران­، ص. 1-9.
 
- فن وی و وانگ فنگ­، (2014)، "مدیریت نگهداری روسازی و پروژه­های توانبخشی تحت عدم اطمینان بودجه.
 
- نثری، پ. و همکارانش­، (1394)، "طراحی سیستم خبره فازی برای تعیین خط مشی ترمیم و نگهداری راه و جاده"، دوازدهمین کنفرانس بین المللی مهندسی صنایع،  ص. 1-14.
 
-مخملباف، م.م. و همکارانش­، (1393)، "به کارگیری روش الگوریتم ژنتیک در مدیریت تعمیر و نگهداری روسازی راه­ها بر پایه مفاهیم توسعه پایدار"، چهارمین کنفرانس بین­المللی توسعه پایدار و عمران شهری، ص. 1-9.
 
-­K. Formela, M. Klein, X. Colom, M.R. Saeb, (2016), “Investigating the combined impact of plasticizer and shear force on the efficiency of low temperature reclaiming of ground tire rubber (GTR)”, Polym, Degrad, Stab. 125,
pp.1–11.
 
-­M. Liang, X. Xin, W. Fan, H. Sun, Y. Yao, B. Xing, (2015), “Viscous properties, storage stability and their relationships with microstructure of tire scrap rubber modified asphalt”, Constr, Build, Mater, 74 pp.124–131.
-­“Bitumen emulsions”, (2008), “Syndicat des fabricants d'émulsions routières de bitumen”, Paris, France, pp.282-290.
 
-­Chou, J. S. (2009), “Web-based CBR system applied to early cost budgeting for pavement maintenance project”, Expert Systems with Applications, 36, pp.2947–2960.
 
-Croteau JM, Davidson JK, Perrone P., (2002), “Surface Slurry Sealing Systems in Canada: Performance and Practice”, Proceedings, Canadian Technical Asphalt Association, 47, pp.433 – 450.
 
-Fan W, Machemehl R. B., (2007),
“A multi-stage Monte Carlo sampling based stochastic programming model for the dynamic vehicle allocation problem, Journal of Advances in Transportation Studies, 12,  pp.27-44.
 
-Fan W, Machemehl R. B., Lownes N E. Carsharing, (2008), “A dynamic vehicle allocation decision making problem. Transportation Research Record 2063, TRB, National Research Council, Washington D. C.
 
-Guy, P. et al, (2015), “Comparative study of French and Chinese asphalt pavement design methods”, J. Appl. Sci. 15 (6), pp.923–928.
 
-Judycki, B. Dołżycki, M. Pszczoła, M. Jaczewski, C. Szydłowski, (2014), “Tests and analysis of application of polymer-rubber modified bitumen to asphalt mixtures
(in Polish)”, Final Report, Gdansk University of Technology, Highway Engineering Division, Gdansk, Poland, pp. 11912.
 
-­Lei et al., (2016), “Using DSR and MSCR tests to characterize high temperature performance of different rubber modified asphalt”, Construction and Building Materials 127 (2016), pp.466–474.
-­Lu XH, Isacsson U., (2008), “Chemical and rheological evaluation of aging properties of SBS polymer modified bitumens”, Fuel; 77(9/10): 961.
 
-Presti, D.L., (2013), “Recycled tyre rubber modified bitumens for road asphalt mixtures”, A literature review Constr Build Mater 49,
pp. 863–881.
 
-Q. Wang, S. Li, X. Wu, S. Wang, C. Ouyang, (2016), ”Weather aging resistance of different rubber modified asphalts, Constr, Build, Mater 106”, pp.443–448.
 
-R.V.O. Almeida, E.F.N. Ju´ nior, B.A. Prata, (2012), “Prioritization of Earth roads maintenance based on analytic hierarchy process”, Int. J. Pavement Res. Technolgy 5 (3), pp.187–195.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
-S.A. Sultan, Z. Guo, (2016), “Evaluating life cycle costs of perpetual pavements in China using operational pavement management system International Journal of Transportation Science and Technology 5”, pp.103–109.
 
-Seran D., (2015), “The effect of polyethylene wax on asphalt performance, Building and Environment”, Volume 43, Issue 6, June, pp.1065-1071.
 
-­Shatanawi et al., (2012), “Effects of furfural activated crumb rubber on the properties of rubberized asphalt”, Construction and Building Materials 28, pp.96–103.
-­Shen Aiqin, (2012), “China Journal of Highway and Transport”. 
 
-Wang F, Zhang Z, Machemehl R. B. (2003), “Decision-making problem for managing pavement maintenance and rehabilitation projects. Transportation Research Record 1853, TRB, National Research Council, Washington D. C.
 
-­Wang, X., (2013), “Long-Life Asphalt Pavement in China. Research Institute of Highway”, MOT, PRC, Bangkok.
 
-Wei, F. and Feng, W., (2014), “Managing pavement maintenance and rehabilitation projects under budget uncertainties”, Journal of Transportation System Engineering and Technology, Vol. 14, No. 6, pp. 92–100.