Quantitative Risk Allocation of BOT Projects in Road Construction

Document Type : Original Article

Authors

1 M. Sc., Grad., Industrial and Systems Engineering Faculty, Tarbiat Modares University, Tehran, Iran.

2 Professor, Industrial and Systems Engineering Faculty, Tarbiat Modares University, Tehran, Iran.

Abstract

Today, the method of Build, operation and Transfer of accepted and effective methods for investing in the construction of fast infrastructure projects required by countries. However, several risks may affect the Build, operation, and Transfer contracts.
One of the most significant topics in study of BOT is process of its allocation to public and private sections. In this paper, by presenting the position of the risk-sharing process in the formation of Build, operation, and Transfer projects, a guidance framework is developed for how to allocate risk among the project's agents.
Therefore, before starting a project and contracting, each of the project risks must be determined according to the appropriate criteria. Study continues by studying risk’s allocation in two quantitative and qualitative levels. Qualitative model uses Bayesian model to allocate risk for employer and contractor in 93.56% and 98.31% levels of significance. In order to identify the risks in the high way project of Tehran-Rasht, we first used 30 action questionnaires and then qualitative assigning and sharing the risk.
In quantitative model, game theory used to allocate minimum of total cost while 35% of risk assigned to employer and 65% to contractor.

Keywords

Main Subjects


- خانزادی، م. نصیر­زاده، ف. و رضایی، م.، (1389)، "تخصیص بهینه کمی ریسک با استفاده از رویکرد پویایی سیستم"، ششمین کنفرانس بین‌المللی مدیریت پروژه، تهران، گروه پژوهشی آریانا.
 
-خزائنی، گ و احمدی ،ل.، (1384)، "مدیریت ریسک در پروژه‌های کلان با رویکردBOT"، دومین کنفرانس بین‌المللی مدیریت پروژه، تهران، گروه پژوهشی آریانا.
 
- محمد بیگی، س.، (1390)، "تخصیص بهینه ریسک در پروژه‌های BOT با رویکرد PMBOK"، پایان‌نامه کارشناسی ارشد، دانشگاه تربیت مدرس.
- Bing, L., Akintoye, A. and Hardcastle, C., (2007), "The allocation of risk in PPP/PFI construction projects in the UK", International Journal of Project Management 23 (2),
pp. 25–35.
-Gupta, A., Trivedi, M., Kansal, R. and Scholar, P., (2013), "Risk variation assessment of indian road ppp projects", International Journal of Science, Environment,5(2),
pp. 1017-1026.
-Medda, F., (2007), “A game theory approach for the allocation of risks in transport public private partnerships", International Journal of Project Management, 25(3), pp.213-218.
-Project Management Institute, (2004), "PMBOK Guide, A guide to the project management body of knowledge ", four compus boulevand USS, pp. 19073-3299.
 
-Silva, L. H., & Crispim, J. A., (2014). The project risk management process, a preliminary study. Procedia technology, 16, 943-949.
 
-Valipour, A., Sarvari, H., Yahaya, N., Norhazilan, M. N., and Khoshnava, S. M. (2014). Analytic Network Process Approach to Risk Allocation of EPC Projects Case Study: Gas Refinery EPC Projects in Iran. In Applied Mechanics and Materials, Trans Tech Publications Ltd. Vol. 567, pp. 654-659.
- Yun-na, W., Xin-liang, H., Ling-shuang, X. and Ze-zhong, L., (2012), “Research on Risk Allocation of Public-private Partnership Projects Based on Rough Set Theory”, Communications in Information Science and Management Engineering, 2(7).