Provision of a prioritization algorithm for maintenance and repair of railways in Iran has been targeted to optimize and update short and long term plans for rail maintenance operations in this research. In this article, the current conditions of the railway in Iran were studied and international studies were conducted to develop a prioritization algorithm. Consequently, the method of designing and developing the necessary models to provide a priority algorithm for maintenance of tracks based on the geometry of the route with the aim of achieving the required safety level of the passenger travel comfort in the current track maintenance methods was presented. The benefits of the new maintenance approach are illustrated by the use of evaluating its outputs with the current approach. The new maintenance algorithm ensures not only the safety of the route, but also the level of comfort needed for the traveler. The results indicate the applicability and feasibility of using the proposed model or algorithm in providing a priority program and planning for the maintenance of the railway.
 
 
 

Keywords


-گروه خط و ابنیه، مرکز تحقیقات راه آهن، (1382)، "بررسی اولیه سیستم تعمیر و نگهداری خطوط راه آهن".
 
-میرمحمدصادقی، س. ج.، (1395)، "‌بهبود رویکرد تعمیر و نگهداری راه آهن با ایجاد یک شاخص وضعیت جدید راه آهن".
 
-میر محمد صادقی، س. ج.، (1391)، "توسعه الگوریتم اولویت بندی و برنامه ریزی برای نگهداری و تعمیرات خطوط راه‌آهن ایران".
 
-Asada, T., Roberts, C., Koseki, T. (2013), “An algorithm for improved performance of railway condition monitoring equipment: Alternating current point machine case study”, Transportation Research Part C, (30) pp.81-92. 
 
-Busstra, M., Dongen, L.V. (2015), "creating value by integrating logistic train's services and maintenance activities", Procedia CIRP (38) pp.250-254
 
-Foguem, B.K., Wandji, Y.F., Foguem, G.T. (2015), “Experienced knowledge for the description of maintained packages”, Journal of Manufacturing Systems.
 
-Horenbeek, A.D., Bure, J., Cattrysse, D., Pintelon, L., Vansteenwegen, P. 2013. INT.J. Production Economics, (143) 499-508 pp.
 
-Innocenti, A., Marini, L., Meli, E., Pallini, G., Rindi, A. 2014. Development of wear models for the analysis of complex railway networks, Wear, (309) pp.174-191. 
 
-Jia, C., Xu, W., Wang, H. (2011), “Study of management information system of railway permanent way safety risks and comprehensive evaluation”, Procedia Engineering, (15) pp.1293-1297.
 
-Jun, H.K., Seo, J.W., Jeon, I.S., Lee, S.H., Chang, Y.S. (2016), “Fracture and fatigue crack growth analyses on a weld-repaired railway rail”, Engineering Failure Analysis, (59) pp.478-492. 
 
 
-Mundrey, J. S. (2009), “Railway track engineering, 4th Ed., Tata McGraw-Hill Education”, New Delhi, India, pp.481–522.
 
 
-Preston, J., and Wall, G. (2007), “Meeting rail passenger user needs: The role of information technologies.” Proc., 11th World Conf. on Transport Research, World Conference on Transport Research Society, Lyon, France.
 
-Talukdar, K., Arulmozhi, U., Prabhakar, K., and Satyanarayan. (2006), “Project presentation improvement of TGI value by computer analysis. ”Ministry of Railways, Indian Railways Institute of Civil Engineering, India.
 
-Zheng, Z., Qi, H., Zhang, H., Ren, D. (2014), “Laser repairing of damaged steel rail with filler wire, Proceedings of Measuring Technology and Mechatronics Automation”, pp.383-386.