AFTES, French National Tunnelling Association, (2005), “Choosing mechanized tunnelling techniques”. Paris.
-Anagnostou, G. and Rizos, D. (2009), “Geotechnical and contractual aspects of urban tunneling with closed shields”. In: ITA-AITES World Tunnel Congress: Safe Tunelling for the City and Environment. City: Budapest, Hungary.
-BTS, British Tunnelling Society in association with the Institution of Civil Engineers. (2005), “Closed-Face Tunnelling Machines and GroundStability: A guideline for best practice”. Thomas Telford Ltd, London, pp.77.
-DAUB, ÖGG & FGU (2000), “Recommendations for Design and Operation of Shield Machines. Tunnel, 6/00, pp.54-76.
-Diponio, M., Chapman, D., Bournes, C. (2007), “EPB tunnel boring machine design for boulder conditions, in Proceedings of the Rapid Excavation and Tunneling Conference”, chapter 20 – Difficult Ground Conditions II, pp.14.
-Edalat, K., Vahdatirad, M., Ghodrat, H., Firouzianbandpey, S., Barari, A. (2010), “Choosing TBM for Tabriz Subway using Multi Criteria Method”. Journal of Civil Engineering and Management. 16(4), pp.531-539.
-Erickson, L., Raleigh, P., Romero, V. (2008), Geotechnical conditions and TBM selection for the Bay tunnel, in Proceedings North American Tunneling 2008, pp.389–398.
-Jerome B. O’Carroll, (2005), “A Guide to Planning, Constructing, and Supervising Earth Pressure Balance TBM Tunneling”. Parsons Brinckerhoff Inc, pp.146.
-KhademiHamidi, J., Shahriar, K., Rezai, B., Rostami, J., Bejari, H. (2009). Risk assessment based selection of rock TBM for adverse geologicalconditions using Fuzzy-AHP, Bulletin of Engineering Geology and the Environment.
-Lovat R. P. (2006), “TBM Design Considerations: Selection of Earth Pressure Balance or Slurry Pressure Balance Tunnel Boring Machines”, International symposium on utilization of underground space in urban areas, Egypt.
-Marinos, P. G., Novack, M., Benissi, M., Panteliadou, M., Papouli, D., Stoumpos, G., Marinos, V., Korkaris, K. (2008). Ground information and selection of TBM for the Thessaloniki metro, Environmental and Engineering Geoscience 14(1): pp.17–30.
-Tarigh Azali, S., Ghafoori, M., Lashkaripour, G., Hassanpour, J. (2013), “Engineering geological investigations of mechanized tunneling in soft ground: A case study, East–West lot of line 7”, Tehran Metro, Iran, Engineering Geology.
-Yazdani-Chamzini, A., Haji Yakhchali, S. (2012), “Tunnel Boring Machine (TBM) selection using fuzzy multicriteria decision making methods”, Tunnelling and Underground Space Technology, pp.194-204.
-Lehner, K., Hartmann, D. (2007), “Using knowledge-based Fuzzy Logic components in the design of underground engineering structures”, in ECCOMAS Thematic Conference on Computational Methods in Tunneling (EURO: TUN), Vienna, Austria, August 27–29,
pp.1–13.
-Kalamaras, G., Brino, L., Carrieri, G., Pline, C., Grasso, P. (2001), “Application of multicriteria analysis to select the best highway alignment, Tunnelling and Underground Space Technology” 15(4), pp.415–420.
-Fahimdanesh, S., Hafezi Moghadas, N., (2014), “Tunneling machine selection model based on geologic parameters using AHP method case study: NOSOUD water tunnel”. Indian J. Sci. Res. 9 (1):
pp. 137-145.
-Thewes, M., & Burger, W. (2004), “Clogging risks for TBM drives in clay”. Tunnels & Tunneling International, pp. 28-31.
-Thewes M. (2007), “TBM tunneling challenges redefining the state of the art”. Keynote lecture ITAAITES WTC, PRAGUE.