-مترجمان: بهرامیان، م. ر. و الیاسی، م. ر. (2000)، "دستیابی به کیفیت در عملیات راهسازی، دبیرخانه مجمع جهانی راه (پیارک)"، وزارت راه و سازی، دفتر مطالعات فناوری و ایمنی.
-CHARLES S. HUGHES, (2005), “State Construction Quality Assurance Programs”, A Synthesis of Highway Practice, Transportation Research Board, and Washington, D.C.
-Arti, P. (2014), “Developing QC/QA Specifications for Hot Mix Asphalt Concrete in Illinois,” Transportation Research Record,
No. 1575, TRB.
-Casas, J. R., Matos, J. C. (2017), “Standardization of quality control plans for highway bridges in Europe: COST Action TU 1406,” Materials Science and Engineering, doi: 10.1088/1757-899X/236/1/012051.
-Colin J. LA Vassar and Joe P. Mahoney, (2013), “statistical assessment of quality assurance-quality control data for hot mix asphalt”, University of Washington, Agreement T4118, Task 29.
-Davis, G. (2000), “Quality Control Quality Assurance Manual for Asphalt Concrete Production and Placement,” California, USA: State of California, Department of Transportation.
- Dos Santos, A. S., Leal, A. G., De Oliveira, J. A., Moreira, J. R., Pistoni, E., Miyake, M. Y., Rigo, A. L., Marte, C. L. (2017), “Methodologies for quality assessment of highway operators based on governance best practices with emphasis on toll collection ecosystem,” Case Studies On Transport Policy, Vol. 5, pp. 112- 120.
-Kamyar, C., Paul, M. (2017), “QC/QA: Evaluattin of Effectivness in Kentucky,” Vol. 47, Final Reportm KTC 08-19/SPR347-07-1F.
-Project Management Institute. (2017), “A Guide to Project Management Body of Knowledge (PMBOK Guide)”. USA: Project Management Institute.