-حقیقت منفرد، ج. رضایی، الف.، (1390)، "ارائه مدل ارزیابی عملکردهوش تجاری برمبنای فرآیند تحلیل شبکه فازی"، مجله مدیریت بهرهوری، شماره 16 ISC-32. ص.7-38.
-مهدی غضنفری، رضایی، م.،(1389)، "نظریه مجموعههای فازی، انتشارات دانشگاه علم و صنعت ایران"، تاریخ انتشار، چاپ دوم.
-Aven t. (2009), “Safety is the antonym of Risk for some perspective of Risk”. J Safety Sci; 47: pp.925-939.
-Azar A., Nahavandi B., Rajab-Zadeh A., (2007), “Planning and improving the quality performance expansion by using fuzzy analytic network process and goal programming, Humanity Science Quarterly, 4, pp.31-67.
-Chen Z, Huang GH, Chahma A., (2000),“Risk Assessment of a Petroleum-Contaminated site through a multi-phase and multi-Component modelling approach”. Journal of Petroleum Science and Engineering, 26: pp.273-281.
-DaneshShakib M., Fazli S., (2009), Differentionate of successful and unsuccessful companies by using compound method (FAHP- TOPSIS) in Tehran’s Stock Exchange, Iran’s Managing Sciences Quarterly, 15, pp.87-115.
-Demidova O, Cherp A., (2005),“Risk Assessment for improved treatment of health consideration in EIA”. j Environ Impact Assess review 25: pp.411-429.
-Eduljee GH. (2000),“Trends in Risk Assessment and Risk Management”.theSci the total Environ 249: pp.13-23.
-Gabus, A., &Fontela, E. (1973),“Perceptions of the World Problemantique: Communication Procedure,Communicating with that Bearing Collective Responsibility (DEMATEL Report No. 1). Switzerland, Geneva: Battelle Geneva Research Centre.
-GogusO., Boucher T.O.(1998), “Strong transitivity, rationality and weak monotonicity in fuzzy pairwise comparisons, Fuzzy Sets and Systems”, 94.
-ISO/IEC Guide 73: (2002), “Risk management -Vocabulary- Guidelines for use in standards”.
-Khadam IM, Kalurachchi JJ.(2003),“Multi-Criteria decision analysis with probabilistic Risk Assessment for the Management of contaminated ground water”.j Environ Impact Assess Review 23: pp.683-721.
-Khan FI, Abbasi SA., (2004),“TORAP- a new tool for conducting rapid risk assessment in petroleum refineries and petrochemical industries”. J App Energy 65: pp.187-210.
-Kon, and Buke, (2007),“An analytical network process (ANP) evaluation of alternative fuels for electricity generation in Turkey”, Energy policy, 37, pp.5220-5228.
-Leung,L.C., D.,Cao,(2000),“On consistency and ranking of alternatives in fuzzy AHP, European Journal of Operational Research, Vol. 124, pp. 102-113.
-Lin, H. F. (2009),“An application of fuzzy AHP for evaluating, course website quality. Computers & Education.
-Lindsay FD.,(1992),“Successful Health and Safety Management the contribution of Management Audit. J Safety Sci 15:
pp.387-402.
-Mearns K, Yule S., (2009),“The Role of national culture in determining Safety Performance:challenges for the global oil and gas industry, j. Safety Sci 47:
pp.777-785.
-Montague P., (2004),“Reducing the harms associated with risk assessment”. J Environ Impact Assess Review, 24: pp.733-748.
-Mirzaei S.,AvakhDarestani S., (2014), “Failure Modes And Effects Analysis Using Anp And Fuzzy Anp”, Trends in life sciences, 3(3): pp.439-450.
-Mirzaei S., MoradiTadi A., Pirzadeh N., AvakhDarestani S., (2014), “Development of Failure modes and Effects Analysis Using ANP and Fuzzy SAW”, Trends in life sciences, 3(3): pp.425-432.
-Najafi A. (2010), “Application of Analytic Network Process (ANP) in analysis of the structural challenges and organization’s executive environment in projects management”, International of Industrial Engineering Journal and Production Management, 1(21), pp.63-76.
-Navaei, AZ., Omidvari, M., (2015),“Development of Failure Mode Effects Analysis Using Demote and ANP Models, Inter”. Conference on management Economics and humanities, Istanbul, Turkey.
-Nouri J, Mansouri N, Abbaspour M, Karbasi AR, Omirvari M., 2011. Designing a developed model for assessing the disaster include vulnerability value in educational centers. J Safety Sci. 1: pp.1010-1016.
-Omidvari, M.; Mansouri, N. (2014),“Fire and Spillage Risk Assessment Pattern in Scientific Laboratories”, Int. J. occupational Hygiene, (6): pp.68-74.
-Opricovic, S., &Tzeng, G. H. (2003). Defuzzification within a multicriteria decision model. International Journal of Uncertainty, Fuzziness And Knowledge-Based Systems, 11(5), pp.635–652.
-Saaty, T.L. (1980),“The Analytic Hierarchy, Process. McGraw-Hill, New York.
-Shabanzadeh DM, Sørensen LT, Jørgensen T: A Prediction Rule for Risk Stratification of IncidentallyDiscovered Gallstones: Results From a Large Cohort Study. Gastroenterology; 150(1):
pp.156–167.
-Singh M, Makeset T., (2009),“A methodology for Risk-based in section planning of Oil and Gas pipes based on Fuzzy logic framework”. Engineering Failure Analysis 16: pp.2098-2113.
-Uzunovic, E., Canizares, C., Huang, Z., Ni, Y., Shen, C., Wu, F., Chen, S. and et al. (2000),“Discussion of Application of unified power flow controller in interconnected power systems-modeling, interface, control strategy, and case study, IEEE Transactions on Power Systems”, 15(4), pp.1461-1462.
-Wei, W.W., Yu, T.L., (2007),“Developing global managers' competencies using the fuzzy DEMATEL method”, Expert System Application, 32(2), pp.499-507.
-Willis, HH. (2007),“Guiding resource allocations based on terrorism Risk”. Risk Analysis; 27: pp.597–606.
-Zadeh, (1965), "
Fuzzy sets", Information and Control 8 (3): pp.338–353.
-Zio, E., (2006), “An Introduction to Basics of Reliability and Risk Analysis, World Scientific, London.
-Zhou W.,Jian-min He., (2012), “Intuitionistic Fuzzy Geometric Bonferroni Means and Their Application in Multicriteria Decision Making, International of intelligent systems”, Vol. 27, Issue 12.