-Adams, M.T., Schlatter, W., and Stabile, T., (2007), “Geosynthetic reinforced soil integrated abutments at the bowman road bridge in defiance county, Ohio”, Proceedings of Geo-Denver 2007: Geosynthetics in Reinforcement and Hydraulic Applications, p. 1–10. American Society of Civil Engineers, Reston, VA.
-Bojanowski, C., Lottes, S.A., Flora, K. Suaznabar, O., Shen, J. and Kerenyi, K., (2017), “Development of a computational approach to detect instability and incipient motion of large riprap rocks”, Argonne National Laboratory, U.S. Department of Energy laboratory.
-Cardoso, A.H., Simarro, G., Fael, C., le Doucen, O. and Schleiss, A.J., (2010), “Toe protection for spill-through and vertical-wall abutments”, Journal of Hydraulic Research, Vol. 48, No. 4, pp. 491-498.
-Dey, S. and Barbhuiya, A.K., (2005), “Flow field at a vertical-wall abutment”, Journal of Hydraulic Engineering, Vol. 131, No. 12,
pp. 1126-1135.
-FHWA, (2017), “Hydraulic performance of shallow foundations for the support of vertical-wall bridge abutments”, Publication NO. FHWA-HRT-17-013.
-Hong, H.A. and Irfan, A., (2019), “Scour around an Erodible Abutment with Riprap Apron over Time”, Journal of Hydraulic Engineering, Vol. 145, No. 6, 06019007.
-Karimaei Tabarestani, M. and Zarrati, A.R., (2018), “Reliability analysis of riprap stability around bridge piers”, Journal of Applied Water Engineering and Research, DOI: 10.1080/23249676.2018.1497556.
-Khademghaeiny, G.N., Abrishami, J., Zarrati, A. R., Karimaei Tabarestani, M., Badali Mashahir, M., “Riprap design at bridge piers with limited scouring”, Scientia Iranica, Article in Press. Accepted Manuscript, Available Online from 18 December 2018.
-Kocaman, S., (2014), “Prediction of backwater profiles due to bridges in a compound channel using CFD”, Advances in Mechanical Engineering, Article ID 905217, 9 pages.
-Lagasse, P.F., Clopper, P.E., Pagán-Ortiz, J.E., Zevenbergen, L.W., Arneson, L.A., Schall, J.D., and Girard, L.G. (2009) “Bridge scour and stream instability countermeasures”, Hydraulic Engineering Circular No. 23”, Report No. FHWA-NHI-09-111. Federal Highway Administration, Washington DC.
-Lauchlan, C.S., Melville, B.W., (2001), “Riprap protection at bridge piers”, Journal of Hydraulic Engineering, Vol. 127, No. 5, pp. 412–418.
-Melville, B.W., van Ballegooy, S., Coleman, S.E., and Barkdoll, B. (2006), “Countermeasure toe protection at spill-through abutments”, Journal of Hydraulic Engineering, Vol. 132, No. 3, pp. 235–245.
-Petersen, T.U., Sumer, M.B., Boegelund, J., Yazici, A., Fredsoee, J., and Meyer, K.E., (2015), “Flow and edge scour in current adjacent to stone covers”, Journal of Waterway, Port, Coastal, and Ocean Engineering, vol. 141, No. 4.
-Tippireddy, R.T.R., (2017), "Air injection as a scour countermeasure at bridge piers", Open Access Master'sThesis, Michigan Technological University.